Yellowstone National Park, Wyoming

WY NPS Yellowstone 13(11) - Pelican Bridge

This Western Federal Lands project is located in Yellowstone National Park east of Fishing Bridge on East Entrance Road (Hwy 20) over Pelican Creek. This is at the north end of Yellowstone Lake.

The existing bridge had been built in the 1930s requiring Pelican Creek to pass through a main opening and smaller culverts. The new bridge is a major improvement by spanning the wetland and allowing the creek to meander naturally through the landscape, as well as unimpeded wildlife passage.

​The new bridge is a 1,483-foot-long steel girder bridge. Approximately 1,500-feet of work bridge was installed alongside to access the work. Over 1,200 truckloads of material, including work bridge materials, were delivered from numerous locations on the West Coast including Springfield, Coos Bay, Los Angeles, and Olympia, to name a few. 
Major Project Elements:
  • Remote Work Location
  • Abbreviated Construction Seasons
  • Heavy Pile Driving
  • Frequent Environmental Monitoring and Extensive Compliance
  • Historic Preservation
Office Locations:

CORPORATE
​HEADQUARTERS/RAIL DIVISION

​PO Box 659
Springfield, OR 97477
P (541) 746-2426
​F (541) 746-7635

ALASKA
​12078 N. Glenn Highway
Sutton, AK 99674
PO Box 309, Sutton, AK 99674
P (907) 746-5307
​F (907) 746-5330​

MOUNTAIN WEST
5350 DTC Parkway, Suite 304
Greenwood Village, CO 80111
P (720) 638-6053
​F (720) 708-6457
MWEstimating@hamil.com

WASHINGTON
​1850 SW 93rd Ave.
Olympia, WA 98512
P (360) 742-3326 
F (360) 742-3579

© Hamilton Construction Co. All Rights Reserved. Equal Opportunity Employer.
  • About Us
  • Divisions
    • Alaska Division
    • Oregon Division
    • Mountain West Division
    • Rail Division
    • Washington Division
  • JOIN OUR TEAM
  • Contact